The release test: a new version must beat the live one

Every week a new version is trained. Before anyone can approve it, it has to pass three checks against the version that is live.

The countonme.now team

Product3

Every Monday at 01:00 the weekly run trains a new version from the decisions your reviewers made the week before. Training is the easy part. The hard part is knowing whether the new version is better. The release test answers that question with three numbers, before any person is asked to approve anything.

Why a test at all

A model that learns every week can also get worse every week. The data might be noisy. Reviewers might disagree with each other. A rule in the business might change halfway through the week. When that happens, training still finishes without an error, and the new version makes more mistakes than the last.

So the question we ask each week is whether the new version makes fewer mistakes than the one that is live today, on pairs neither of them has seen. If it does not, the new version stays out and nothing changes for you.

The three checks

A candidate must pass all three. One failure is enough to block it.

  1. Mistakes on the test set. At the start, before the first training, we put aside a test set of past pairs with known answers. It is never used for training. The candidate must make no more mistakes on it than the live version.
  2. Automatic answers wrong. For the candidate we choose a new cut-off: how sure it must be to answer by itself. At that cut-off, its automatic answers on the test set must be wrong at most 2 times in 100. You set that limit.
  3. Mistakes on this week’s set-aside pairs. Each week, 1 in 5 reviewed pairs is put aside and never trained on. Half of them are used here. The candidate must make fewer mistakes on them than the live version.

The first check protects you against slow drift. The third makes sure the candidate handles the pairs your business is seeing right now. The second keeps the promise you made to your risk team.

A real week

Here is the run from Monday 9 November at Larkspur Bank. The candidate was Version 9. The live version was Version 7.

Check Version 9 Version 7 Result
Mistakes on the test set of 5,000 pairs 262 277 Passed
Automatic answers wrong, limit 2% 1.6% Passed
Mistakes on 129 set-aside pairs from week 8 26 34 Passed

Version 9 passed all three. Its cut-off was set at 92%. At 09:05 an operator, Marcus Okafor, approved it, and it went live. Version 7 was retired and kept.

Why there is no Version 8 in that table

The week before, Version 8 failed all three checks. The test blocked it, Version 7 stayed live, and week 8 ran on Version 7. Version 9 was therefore compared with Version 7, not with a version that never went live. We wrote about that week too.

What the operator sees

The weekly report shows the six steps of the run (Record, Clean, Grade, Train, Test, Deploy) with the count at each step. Step 5 is a small table like the one above. The operator does not need to read a training log. They read three rows, each with two numbers and the word Passed or Failed.

If all three pass, the candidate waits on the Versions page with two buttons: Approve and Block. If any check fails, the candidate is already blocked, and the report says which check failed.

What we chose not to do

We do not average the three checks into one score. A single score hides the check that failed. We do not let a candidate through because it is “close”. The live version already works, so a tie is a failure. And we do not skip the test when a week is quiet. A quiet week is when a slow change goes unnoticed.

The release test is the reason we can say “a worse version never goes live” and mean it. The same three numbers are in your audit log for every week since launch.

Count on it.